Ground floor:
Satsang Hall to accommodate over 260 people, with capability for overflow of 100 people onto front veranda
-original foundation completed in 2008

First Floor:
Women’s accommodation for approx 28, having a combination of single, double and dorm type rooms

Roof:
A section of the roof will have a lookout and seating area

Construction status:
Original foundation was completed in 2009. An extension of the foundation and construction of lower 2 levels (storage/kitchen, dining) will be constructed at the same time as the garden landscaping.
Completion:
Lower levels (storage/dining)- summer 2010
Ground floor (Satsang hall) level – fall 2010
First floor/roof (Women’s accommodation) – fall 2010