A new outdoor platform has been built below the existing Dome structure. This will be an area for yoga and other multi-use purposes.
A walkway will connect the Meditation Dome with the new Satsang Hall (located on the ground floor of Nityananda Hall)

|
The existing ‘Dome building’ will be for meditation only. Modifications include removal and replacement of existing front extension with walkway. Interior room will have bench seating along perimeter walls to allow for sitting (and storage within). A small platform at one end for Sri Vasudeva to sit. Upgraded lighting, and new finishing on the walls.
 |